Brief Description: Installed nutplates and vent door frame
Completed step 6 page 23iS/U-07.
Step 6: Dimpled the nutplate holes around the triangular opening in F-01270-L-1 & -R-1 (flush outboard side). Riveted nutplates to these holes as shown.
Completed step 11 page 23iS/U-08
Step 11: Clecedo then final-drilled #30 all common holes between F-1086A, F-1086B and F-1096 to F-01270-L-1 as shown in Figure 5. Disassembled, deburred then riveted the parts together.