Brief Description: Step rib and bulkhead part prep
Primarily parts prep for upcoming assemblies Completed step 3 page 21iS/U-16. Step 3: Dimpled #40 the nutplate attach holes indicated in F-01226-R-1. per Figure 2. Repreated for the left side.
Completed steps 1-4 page 21iS/U-17 Step 1: Separated F-01236-1 into four angles by removing the hatched areas shown in Figure 1.
Step 2: Trimmed the flanges of F-01236B-L-1 & -R-1 as shown in Figure 2. Step 3: Trimmed the flanges of F-01236A-L-1 & -R-1 as shown in Figure 3. Step 4: Primed the four angles.
Completed step 3 page 21iS/U-18. Step 3: Dimpled #40 the four nutplate attach holes in the top flange of F-01202F-1. Also completed the $30 dimples that are part of step 2 in F-01202F-1.