Completed step 4 page 29A-05. Clecoed then riveted the canopy attach doublers and strut attach angles to the canopy ribs per figure 2. Riveted all remaining nutplates shown in Figure 3 that attach to these parts. Completed step 5 – dimpled nutplate rivet holes in aft flange of the F-1202B panel base and corresponding nutplates. Riveted the nutplates to the aft flange per Figure 3. Dimpled rivet holes and nutplates and installed 4 units that attach to the F-1202B web.