KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  12-30-2016
Number of Hours:  4.00
Manual Reference:  24-03, 04, 05
Brief Description:  Baggage bulkheads

Completed step 6 page 24-03 - Separated the F-1207C Baggage Bulkhead into left and right parts as shown in Figure 2. Completed steps 1 -3 page 24-04 - Clecoed the F-1207C-L & -R Baggage Bulkheads to the Tailcone Assembly as shown in Figure 1 after marking a centerline in the forward face of the F-1284-L & -R Shear Clips. Match-Drilled #30 the two holes from the F-1207C-L & -R Baggage Bulkheads into the corresponding F-1284-L & -R Shear Clips as called out in Figure 1 (double checked that the centerline drawn in Step 2 is centered in the two holes before match-drilling). Removed the bulkheads, cleaned and deburred holes. Completed step 1 page 24-05 - Dimpled the nutplate attach holes (flush forward side) in the F-1207A Baggage Bulkhead, F-1207C-L & -R Baggage Bulkheads and F-1207D-L & -R Baggage Bulkhead Channels per Figure 1. Noted that the F-1270D L&R baggage bulkhead channels have one 0.375 hole and one 0.75 hole versus the 3-0.375 holes shown in the plans. Will need to confirm if these are the latest rendition of the parts.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.