Brief Description: Start Installation of Right Wing Ribs
Start assembly of right wing structure – completed step 1 page 15-06 – attached and riveted W-1210-L forward trimmed main rib to the W-1206-R spar assembly. Completed step 2 – attached and riveted the W-1210-L trimmed main rib which was match drilled to the W-1216B-R hinge rib. Per step 3 installed and riveted 2 of 3 W-1210-L main ribs to the W-1206-R spar assembly. Temporarily clecoed remaining W-1210-L ribs to the structure – 7 ribs still need to be deburred and primed prior to final installation which will complete the preparation on all remaining wing ribs!