Brief Description: Prep of New R-1205 Hinge Bracket
Received new R-1205 hinge bracket. Drilled out holes per 07-02 steps 4 and 5 and separated per step 6. Deburred holes and edges. Primed part.
Jumped to 08-03 AST control horn preparation. Completed steps 1&2 for HS 1220-L and HS-1220-R. Countersunk 5 holes on each control horn for the 3/32 rivets per dwg