KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  2-4-2010
Number of Hours:  1.70
Manual Reference:  
Brief Description:  Fuselage Conclusion

Remove protective coating on tape and apply fabric to door frames and posts.

Secure all 4 doors to fuselage with 1/8" rivets (approx 64 total for all doors). Check for smooth fit. All OK.

Rivet center of windshield to both upper and lower crossover former tubes. Remove protective coating from both sides of lexan
' style=

Fabric taped down

Fabric taped down

' style=

Aft door in

Aft door in

' style=

All doors in

All doors in

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.