KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  10-12-2009
Number of Hours:  2.40
Manual Reference:  
Brief Description:  Fuel/Primer

Primer: Connect 1/8" ID primer tubing to primer pump in cockpit and lock onto barbs with Snap-its (1/4").

Drill 5/8" hole in forward bulkhead and inset 1/2" ID rubber grommets, then snake primer tubing through and route aft. Secure with nylon cable clamps riveted into place with 3/16" Al rivets. Drill 5/8" hole in firewall and insert 1/2" grommet. Run primer tubing through grommet toward location of gascolator.
' style=

Primer pump

Primer pump

' style=

Primer tubing thru forward bulkhead

Primer tubing thru forward bulkhead

' style=

Primer tubing thru fire wall

Primer tubing thru fire wall

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.