Install HB-17 (right only) between boom and leading edge of vertical stabilizer, allowing for offset 1'2" to the right, with 1/8" long rivets. Do same with HB-18 boom bracket (right only).
Install HF-23 tail skid and secure into place with 4 1/8" rivets.