KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  8-13-2008
Number of Hours:  1.90
Manual Reference:  Dwgs 8 & 5A
Brief Description:  Vert. Stabilizer brackets

Install HB-17 (right only) between boom and leading edge of vertical stabilizer, allowing for offset 1'2" to the right, with 1/8" long rivets. Do same with HB-18 boom bracket (right only).

Install HF-23 tail skid and secure into place with 4 1/8" rivets.

Spray paint main landing gear.
' style=

Right forward vert. stabilizer mounting bracket

Right forward vert. stabilizer mounting bracket

' style=

Right center tail bracket

Right center tail bracket

' style=

Tail skid riveted in place

Tail skid riveted in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.