Powered By Kitlog Pro v2.0
HERB'S WEB SITE
Peitenpol Air Camper
All
8-19-2015
< Previous Log Entry
Next Log Entry >
Date:
8-19-2015
Number of Hours:
5.00
Manual Reference:
Brief Description:
Fabricated spreader bars.
Spreader bars are 5' lenths of 3/4 20 Gauge tubing as per drawings
Bungee are temperary and will be replaced with 5/8"bungees as per drawings
Hickory landing struts are shaped using disc sander
Speader bars
Temp Bungees
Shaping landing struts
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Peitenpol Air Camper Home
Category
# Logs
# Hours
All
28
262
controls
6
27
Empennage
2
19
Fittings
4
22
Fuselage
2
32
Miscellaneous
1
20
Tools
1
2
turtle deck
1
4
under carridge
2
30
Welding
1
20
Wings
8
86
Copyright © 2001-2024 Matronics. All Rights Reserved.