KitLog pro

Powered By Kitlog Pro v2.0

Bills Web Site
' style=
Date:  7-16-2011
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Oil door, battery box

Sanded oil door area, masked off with plastic tape as a release, then stuffed
micro into the gap between the oil door and the fuselage. Let cure about
35 minutes, then cut the door outline with an exacto knife. Final cure overnight.

Found best location for Shorai battery on firewall. Designed a battery box, cut
the pattern out of poster board, then constructed the box out of carbon fiber.
Will cure overnight.

Made up preliminary carbonu-clamps by laying up 6 - 8 bid layers over 1/2",
5/8" and 3/4" tubes. Will saw up and drill bolt holes once it all cures.
' style=

Oil door micro outline cut

Oil door micro outline cut

' style=

oil door in progress

oil door in progress

' style=

Battery box construction

Battery box construction

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.