Discussed whether to run temperature probe wires out to the left wing tip or be more efficient and run a short length of wires down the left main gear pant leg. Opted for the left gear leg, since there was room. Horrible time for Bill to thread the wire up the pant leg, due to 2 ribs inside the fairing.
Soldering iron created nice little hole in the fabric in the belly, wire was passed thru and a rubber grommet installed there.