LNC4
Assembly
5-25-2012
< Previous Log Entry
Next Log Entry >
Date:
5-25-2012
Number of Hours:
9.00
Manual Reference:
Brief Description:
Assembly
Installed elevators on stab. Found a few points where painting caused slight rubbing. Found elevators very slightly underbalanced.
Removed elevators, sanded interferrence areas, mixed a lead shot/epoxy/flox mixture and filled previously drilled holes with it.
Installed oil door in upper cowling. Found an area of cowling that I had missed buffing. Buffed.
Installed cabin door hinges and hinge covers.
Installed MLG doors.
Installed wing root inspection panels.
Gear doors installed
Hinges and hinge covers
Adding lead to elevator
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S6-S Home
LNC2 Home
LNC4 Home
Category
# Logs
# Hours
All
831
6961
Aircraft Kit
4
30
Assembly
4
36
Avionics
10
256
Doors
2
47
Electrical
45
364
Empennage
73
526
Engine
41
374
Firewall Forward
3
77
Flight controls
2
35
Flight controls
8
192
Fuel
3
77
Fuel System
111
697
Fuselage
255
1545
Hardware
2
47
Hydraulics
17
125
Instrument Panel
25
241
Insturment Panel
4
26
Landing Gear
11
149
Misc.
1
4
Miscellaneous
9
189
Paint
92
758
Panel
2
21
Paperwork
1
0
Weight & Balance
1
9
Wings
105
1136
Copyright © 2001-2024 Matronics. All Rights Reserved.