Re-plumbed fuel lines from header tank to boost pump. Shutoff valve was in the way of the foot well tank by 1/8 inch. Added elbow to bring valve outboard. Fabricated new 1/2" line from shutoff valve to boost pump.
Removed old starter. Replaced with new Tempest starter.
Added various brackets to engine baffling.
Bundled CHT and EGT wires from probes and from engine monitor. Still need to add connectors.