Powered By Kitlog Pro v2.0
Bills Web Site
LNC4
Instrument Panel
3-31-2008
< Previous Log Entry
Next Log Entry >
Date:
3-31-2008
Number of Hours:
9.00
Manual Reference:
Brief Description:
Holes
Put panel in plane. Checked clearance of items installed so far. All good.
Checked clearances for GRT and audio panel.
Layed out GRT cuts.
Cut GRT hole with jig saw and LOTS of hand filing.
Panel with paper GRT
Hole cut for GRT boxes
GRT chassis installed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S6-S Home
LNC2 Home
LNC4 Home
Category
# Logs
# Hours
All
831
6961
Aircraft Kit
4
30
Assembly
4
36
Avionics
10
256
Doors
2
47
Electrical
45
364
Empennage
73
526
Engine
41
374
Firewall Forward
3
77
Flight controls
2
35
Flight controls
8
192
Fuel
3
77
Fuel System
111
697
Fuselage
255
1545
Hardware
2
47
Hydraulics
17
125
Instrument Panel
25
241
Insturment Panel
4
26
Landing Gear
11
149
Misc.
1
4
Miscellaneous
9
189
Paint
92
758
Panel
2
21
Paperwork
1
0
Weight & Balance
1
9
Wings
105
1136
Copyright © 2001-2024 Matronics. All Rights Reserved.