This entry covers Sept 4 through Sept 7. Lots of small misc projects. Installed landing light. Attached firewall insulation to exhaust tunnel with RTV. Mounted sniffle valve. Ran lines from cylinder drains to sniffle valve. Replaced fuel pressure line.
Wes arrived from Florida to help with wiring and has been working tirelessly on the electrical and wiring, stopping only to sleep and drink wine :-)