Powered By Kitlog Pro v2.0
Bills Web Site
LNC4
Electrical
9-6-2011
< Previous Log Entry
Next Log Entry >
Date:
9-6-2011
Number of Hours:
6.00
Manual Reference:
Brief Description:
Wiring
Lots of final routing and bundling of wires.
Added in-line fuse holder with 1 amp fuse to hot battery bus.
Ran bat 3 wire with pre-existing bundle.
Ran P-Mag power switch wires into bundle, still need to route through firewall.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S6-S Home
LNC2 Home
LNC4 Home
Category
# Logs
# Hours
All
831
6961
Aircraft Kit
4
30
Assembly
4
36
Avionics
10
256
Doors
2
47
Electrical
45
364
Empennage
73
526
Engine
41
374
Firewall Forward
3
77
Flight controls
2
35
Flight controls
8
192
Fuel
3
77
Fuel System
111
697
Fuselage
255
1545
Hardware
2
47
Hydraulics
17
125
Instrument Panel
25
241
Insturment Panel
4
26
Landing Gear
11
149
Misc.
1
4
Miscellaneous
9
189
Paint
92
758
Panel
2
21
Paperwork
1
0
Weight & Balance
1
9
Wings
105
1136
Copyright © 2001-2024 Matronics. All Rights Reserved.