Powered By Kitlog Pro v2.0
Bills Web Site
LNC4
Electrical
6-5-2011
< Previous Log Entry
Next Log Entry >
Date:
6-5-2011
Number of Hours:
6.00
Manual Reference:
Brief Description:
Wiring
Bundled and combed wiring bundles under main gear box.
Connected wires to AOA flap bias microswitch.
Installed and connected ELT antenna.
Riveted autopilot pitch servo push rod to elevator push rod.
Tightened all check nuts on elevator push rods.
Torqued elevator rod end bearings at idler arm.
Torqued idler arm pivot bolt.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S6-S Home
LNC2 Home
LNC4 Home
Category
# Logs
# Hours
All
831
6961
Aircraft Kit
4
30
Assembly
4
36
Avionics
10
256
Doors
2
47
Electrical
45
364
Empennage
73
526
Engine
41
374
Firewall Forward
3
77
Flight controls
2
35
Flight controls
8
192
Fuel
3
77
Fuel System
111
697
Fuselage
255
1545
Hardware
2
47
Hydraulics
17
125
Instrument Panel
25
241
Insturment Panel
4
26
Landing Gear
11
149
Misc.
1
4
Miscellaneous
9
189
Paint
92
758
Panel
2
21
Paperwork
1
0
Weight & Balance
1
9
Wings
105
1136
Copyright © 2001-2024 Matronics. All Rights Reserved.