Re-made lines from hydraulic control valve to firewall for nosegear operation. Origional lines interferred with rudder pedals.
Ran string from rudder cable attach point on rudder pedal bar to baggage bulkhead to plan path for rudder cables. Temporarily installed right half of v stab to get proper position of cable exit from fuselage.