Drilled fwd face of gear box. Installed hydrualic fittings. Installed fittings to gear and flap control unit. Made up and installed 2 lines from gear box to gear/flap control unit. Changed configuration of fittings on control unit from manual to allow better access. Changed fittings on fwd face of gear box from 45 degree to 90 degree.