KitLog pro

Powered By Kitlog Pro v2.0

Bills Web Site
' style=
Date:  8-9-2007
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Baggage floor

Made fore-aft layups on aft baggage compartment floor at center and on forward floor at center (joint between left and right. Layup consisted of 3 bid spanning 4 inches (fwd right floor released with plastic tape), a 1/16 inch phenolic standing 2 inches tall and a three bid on each side of the phenolic transitioning to floor piece.

These supports will increase stiffness and strength of bag floor.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.