Worked on installing air ducting from overhead duct to plenum in tail. Made several cardboard templates for aft baggage bulkhead. Designed installation of air valve.
Sanded yesterday's micro. Installed left elevator push rod, control stick and aileron cross tube. Installed left sidewall and arm rests. Checked stick clearance and push rod clearance. Enlarged cut-out for stick. Removed core in sidewall where push rod was rubbing on sidewall.