KitLog pro

Powered By Kitlog Pro v2.0

Bills Web Site
' style=
Date:  3-15-2008
Number of Hours:  10.00
Manual Reference:  
Brief Description:  SmoothPrime

Drilled #60 holes in rudder trim tab hinge for safety wire.
Microed elevator trim tab push rod fairing.
Applied Evercoat body putty to scratches, pinholes, etc.
Sanded evercoat.
Thorough vacuuming of empennage. Used compressed air to blow any remaining dust. Wiped down with acetone.
Applied 3 coats of PolyFiber SmoothPrime with foam squeegee.
Cut kerfs for inspection panels in SmoothPrime
' style=

trim tab fairing

trim tab fairing

' style=

mixing SmoothPrime

mixing SmoothPrime

' style=

after 3 coats

after 3 coats

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.