Spent all day trimming, sanding and fitting right half of v stab. It was worth the work. The bonding went smoothly thanks to all the prep work. All bonding was done with hysol and hysol/flox.
Hinge line rake angle is 65.1 degrees (manual calls out "approximately 65 degrees). Tail is perfectly vertical as measured with plumb bob and also with a lasar.