Drilled and shaped 1/4" phenolic block for sight gauge tube support. Drilled tank for same. Bonded lower sight gauge tube through tank side.
Covered lower surface of tank top with release tape. Layed up 3 bid carbon onto release tape. Mounded micro around tank top perimeter and on baffle top edges. Placed tank top with released 3 bid layup onto tank and wieghted with shot bags so that tank top conforms to tank sides upper edges.
3 bid layer that is now attached to tank will be cut, shaped and reinforced with bid to become cap strips.