KitLog pro

Powered By Kitlog Pro v2.0

Bills Web Site
' style=
Date:  2-8-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  baggage floor

Sanded flox on hardpoints flush with surface.
Drilled 8 hardpoints for #10 holes and 2 hardpoints for 1/4" holes (baggage tie down rails).
Countersunk 8 attach points for #10 machine screws.
Installed 8 #10 nutplates and 2 1/4" nutplates.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.