Sanded and prepped all areas to be covered by bid. Added 3 bid glass to right & left interrior v stab/h stab interface Added 3 bid glass to fwd and aft face of v stab aft spar/ h stab intersection. Added 3 bid glass to interrior surface of NACA duct. Added 3 bid carbon to right & left lower exterrior h stab / fuselage intersection. Added 2 bid carbon to right upper h stab / v stab intersection. Added 2 bid carbon to 6 inch area of interrior and exterrior sternpost for pushrod hole. Added 1 bid carbon to right fuselage joggle. Added 1 bid carbon to right v stab joggle.