Sanded micro on upper and lower h. stab surfaces. Installed elevators and checked deflection. Found a few areas where h. stab t.e. rubbed on elevator at extreme throw. Sanded h. stab t.e. to allow clearance. Squeeged one coat of SmoothPrime on all surfaces. Brushed 2 additional coats on all surfaces.