Trimmed top of bulkhead to line up with next 2 aft bulkheads. Checked wheel clearance. Cored top edge of bulkhead. Filled cored area with micro. Layed bulkhead onto 2 bid carbon strip. Added 2 bid carbon attach tapes to each side.
Gathered parts to begin main gear retract mechnism installation. Began assembly of gear retract mechanism.