This report is for Sept 8 and 9. Hours represent total man hours. Wes continued with wiring. Carl added connectors to wingtip wiring and got all wingtip lights operational. Sue, Bill, Bob P. and Ron B. worked on baffling. Bob P. inspected aircraft exterior and added washers to aileron hinges. Bill re-assembled wingtips. Added connector to landing light wiring in cowling. Jacked airplane, tightened MLG axle nuts and installed cotter pin. Inflated all tires. Accomplished many other small details.