KitLog pro

Powered By Kitlog Pro v2.0

Bills Web Site
' style=
Date:  9-8-2012
Number of Hours:  30.00
Manual Reference:  
Brief Description:  Wiring and other details

This report is for Sept 8 and 9. Hours represent total man hours.
Wes continued with wiring.
Carl added connectors to wingtip wiring and got all wingtip lights operational.
Sue, Bill, Bob P. and Ron B. worked on baffling.
Bob P. inspected aircraft exterior and added washers to aileron hinges.
Bill re-assembled wingtips.
Added connector to landing light wiring in cowling.
Jacked airplane, tightened MLG axle nuts and installed cotter pin. Inflated all tires.
Accomplished many other small details.
' style=

taxi light, nav light & strobe

taxi light, nav light & strobe

' style=

MLG wheels ready to go

MLG wheels ready to go

' style=

Baffling work continues

Baffling work continues

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.