Powered By Kitlog Pro v2.0
Bills Web Site
LNC4
All
6-15-2012
< Previous Log Entry
Next Log Entry >
Date:
6-15-2012
Number of Hours:
10.00
Manual Reference:
Brief Description:
Buffing + misc
Finished buffing the fuselage. Looks pretty good...not perfect, bur pretty good.
Installed washers and nuts on rudder hinge bolts, a challenging job in very tight spots.
Connected rudder cables to rudder.
Made flaired tubing to transition the output from the pitot tube to nylaflow tubing.
Began running wire through left wing conduit for aileron trim, pitot heat, nav lights and strobes.
Tail completely finished
transition from flare to nylaflow
Rudder cable
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S6-S Home
LNC2 Home
LNC4 Home
Category
# Logs
# Hours
All
831
6961
Aircraft Kit
4
30
Assembly
4
36
Avionics
10
256
Doors
2
47
Electrical
45
364
Empennage
73
526
Engine
41
374
Firewall Forward
3
77
Flight controls
8
192
Flight controls
2
35
Fuel
3
77
Fuel System
111
697
Fuselage
255
1545
Hardware
2
47
Hydraulics
17
125
Instrument Panel
25
241
Insturment Panel
4
26
Landing Gear
11
149
Misc.
1
4
Miscellaneous
9
189
Paint
92
758
Panel
2
21
Paperwork
1
0
Weight & Balance
1
9
Wings
105
1136
Copyright © 2001-2024 Matronics. All Rights Reserved.