KitLog pro

Powered By Kitlog Pro v2.0

Bills Web Site
' style=
Date:  6-15-2012
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Buffing + misc

Finished buffing the fuselage. Looks pretty good...not perfect, bur pretty good.

Installed washers and nuts on rudder hinge bolts, a challenging job in very tight spots.
Connected rudder cables to rudder.

Made flaired tubing to transition the output from the pitot tube to nylaflow tubing.

Began running wire through left wing conduit for aileron trim, pitot heat, nav lights and strobes.
' style=

Tail completely finished

Tail completely finished

' style=

transition from flare to nylaflow

transition from flare to nylaflow

' style=

Rudder cable

Rudder cable

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.