KitLog pro

Powered By Kitlog Pro v2.0

Bills Web Site
' style=
Date:  5-5-2011
Number of Hours:  25.00
Manual Reference:  
Brief Description:  Catch up #1

Sorry, I haven't been very good at documenting my work the past several months. My last entry was March 9, 2011. There's been Sun n Fun, and a month working on the house in Florida, and a trip to the Bahamas in 5ZQ and general lazyness about documentation. In this and the next entry I'll try to catch up with the work done to date.

Continued working on relay wiring.
Added 2 bid carbon around all cabin window interriors.
Micro around windshield and all window interriors.
Fitted overhead air duct.
Fabricated and installed electrical conduit running up forward side of door frame to overhead duct.
Removed forward panel on overhead duct. All airflow will be forward.
Fabricated transition from aft end of air duct to 3" tubing for scat tubing.
Bonded air duct to fuselage top.
Micro and bodywork around duct.
Lots and lots of micro and sanding on fuselage top.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.