Powered By Kitlog Pro v2.0
Bills Web Site
LNC4
All
12-4-2010
< Previous Log Entry
Next Log Entry >
Date:
12-4-2010
Number of Hours:
6.00
Manual Reference:
Brief Description:
Nose gear door
Installed brake line on right main gear from top of gear leg.
Drilled out 4 alignment tabs in nose gear doors. Remade tabs and installed.
Saftied all bolts on main gear cylinders.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S6-S Home
LNC2 Home
LNC4 Home
Category
# Logs
# Hours
All
831
6961
Aircraft Kit
4
30
Assembly
4
36
Avionics
10
256
Doors
2
47
Electrical
45
364
Empennage
73
526
Engine
41
374
Firewall Forward
3
77
Flight controls
8
192
Flight controls
2
35
Fuel
3
77
Fuel System
111
697
Fuselage
255
1545
Hardware
2
47
Hydraulics
17
125
Instrument Panel
25
241
Insturment Panel
4
26
Landing Gear
11
149
Misc.
1
4
Miscellaneous
9
189
Paint
92
758
Panel
2
21
Paperwork
1
0
Weight & Balance
1
9
Wings
105
1136
Copyright © 2001-2024 Matronics. All Rights Reserved.