Powered By Kitlog Pro v2.0
Bills Web Site
LNC4
All
12-2-2010
< Previous Log Entry
Next Log Entry >
Date:
12-2-2010
Number of Hours:
5.00
Manual Reference:
Brief Description:
Nose gear door body work
Sanded yesterdays micro around nose gear door. Lots of fun sanding upwards. Came out pretty good, need to add a little skim coat.
Extensive filing of alignment tabs and adjusting closing rods to assure that doors close symetrically and that the tabs don't hang up.
Mounted nose gear down micro switch on overcenter link.
Wrapped dash 3 hose with nylon spiral wrap for abrasion resistance. Mounted adel clamp on gear box and routed hose to absorb movement of gear trunion.
nose gear doors
nose gear micro switch
left brake line
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S6-S Home
LNC2 Home
LNC4 Home
Category
# Logs
# Hours
All
831
6961
Aircraft Kit
4
30
Assembly
4
36
Avionics
10
256
Doors
2
47
Electrical
45
364
Empennage
73
526
Engine
41
374
Firewall Forward
3
77
Flight controls
2
35
Flight controls
8
192
Fuel
3
77
Fuel System
111
697
Fuselage
255
1545
Hardware
2
47
Hydraulics
17
125
Instrument Panel
25
241
Insturment Panel
4
26
Landing Gear
11
149
Misc.
1
4
Miscellaneous
9
189
Paint
92
758
Panel
2
21
Paperwork
1
0
Weight & Balance
1
9
Wings
105
1136
Copyright © 2001-2024 Matronics. All Rights Reserved.