Adjusted slot width and reinstalled top and seats several times to get adequate clearance from seat rail. Release taped PVC tubing and secured in slots from top. Applied 3 bid carbon to bottom side of tank top using protruding tubing as a mold. Peel plied.
Made several measurements and tested ideas for fuel pickup tube and shutoff valve. Drilled hole through outside layer of carbon only. Cored area around hole.