Cut top of tank 1/4" below level of main spar box. Installed seats to check for clearance...uninstalled seats. Cored top of tank and filled with epoxy/flox. Layed up 2 bid cap strip and placed on peel ply. Pressed tank top onto cap strip. Layed in 4 bid support strips extending 2" onto tank sides.