Released 15 bid bracket layups from tank and gear box. Shaped and sanded brackets. Through drilled 2 - 3/16 holes in each bracket and through gear box. Through drilled 1 - 3/16 hole in each bracket and through phenolic in tank. Installed nutplates in fwd gear box attach holes and all tank holes. Installed bolt and nuts in aft gear box attach holes.