KitLog pro

Powered By Kitlog Pro v2.0

HANSRUDOLF'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-25-2017
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Balancing of Control Surfaces

Balancing of Ailerons and Flaps

- The aileron and flaps were mounted on na special jig to allow free movemnt

- Calculated weight to allow for covering and painting was place on the CoG of the control surface

- Counter Weight prepared for the nose tubes of the control sutface. Molten lead was then poured into the tubes

- Complete counterweight tubes were then installed in the nose of the control surfaces and then rivetted into place
' style=

Aileron mounted in jig and lead weightfor covering/paint fixed to CoG of control surface

Aileron mounted in jig and lead weightfor covering/paint fixed to CoG of control surface

' style=

Counterweight tube filled with lead weighed to be sure proper countereight is achieved

Counterweight tube filled with lead weighed to be sure proper countereight is achieved

' style=

Completed tube inserted into nose, checked for balanced and rivetted in place

Completed tube inserted into nose, checked for balanced and rivetted in place

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.