KitLog pro

Powered By Kitlog Pro v2.0

HANSRUDOLF'S WEB SITE
' style=
Date:  11-30-2015
Number of Hours:  10.00
Manual Reference:  2/3
Brief Description:  Interior Wall Panels

Interior Wall Panel Installation

- Using PVC pipes, cut and trimmed 1/4 tubes to form covers for control cables (rudder and flap cables). The cutting of the tubes incorporated providing attachment taps, which then were heatformed (bent) to be fixed to the panels.
- Various aluminium channels were then trimmed to provide glue seams for the future roof covering and installed on the air frame
' style=

PVC channel for flap control cable including alu channel for future ceiling glue joints

PVC channel for flap control cable including alu channel for future ceiling glue joints

' style=

PVC channel for rudder control cable showing attachment lug

PVC channel for rudder control cable showing attachment lug

' style=

Flap channel alignment with deflection pulley

Flap channel alignment with deflection pulley

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.