KitLog pro

Powered By Kitlog Pro v2.0

HANSRUDOLF'S WEB SITE
' style=
Date:  1-31-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Run conduit for Nav/Strobe lights, pump and pitot

Electrical Conduit Installation:

- Prepared doublers for rib penetrations and installed doublers

- Prepared support brackets for conduit at rib lighting holes

- Run conduit from wing tip to root rib for Nav/Strobe light and trnsfer pump circuit

- Install second conduit for heated pitot tube and AoA pre-stall warner
' style=

Conduit run to wing tip/pitot location

Conduit run to wing tip/pitot location

' style=

Twin conduit crossing over flap actuator

Twin conduit crossing over flap actuator

' style=

Twin conduit at root rib

Twin conduit at root rib

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.