KitLog pro

Powered By Kitlog Pro v2.0

HANSRUDOLF'S WEB SITE
' style=
Date:  4-4-2015
Number of Hours:  3.00
Manual Reference:  1/2
Brief Description:  Assembly of shock struts

Assembly of Shock Struts:

- Turned down and polished strut rod plunger at top over length of strut operation to achieve smooth operation with bronze top cap

- checked operation of top cap to esure no tight spots over range of operation

- Installed O-rings in piston and top cap and installed plunger in strut casing
' style=

Polished strut rod end

Polished strut rod end

' style=

Compression spring installed

Compression spring installed

' style=

Top cap placed on plunger

Top cap placed on plunger

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.