KitLog pro

Powered By Kitlog Pro v2.0

Ross's RV-7 Build Log
' style=
Date:  8-24-2008
Number of Hours:  18.00
Manual Reference:  
Brief Description:  Working on surrounding walls

Work has begun on the surrounding walls. Most of the materials used for the build will be from salvage or leftovers from unrelated construction projects. The whole idea is to create a workshop that’s as comfortable and workable as possible for as little as possible. Keep the costs down.
' style=

RSJ added to strengthen the dividing wall

RSJ added to strengthen the dividing wall

' style=

Coming along nicely

Coming along nicely

' style=

Salvaged glass panelling to be installed above the door area

Salvaged glass panelling to be installed above the door area

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.