KitLog pro

Powered By Kitlog Pro v2.0

GAYLON'S WEB SITE
' style=
Date:  2-15-2013
Number of Hours:  4.00
Manual Reference:  No Ref
Brief Description:  Flightline AC, Access panel pass thru for the hose

Friday 15th, 2013 (4 hours), I worked on cutting the pass thru holes for the high and low pressure evaporator lines plus the fan electrical wires and thermister sensor. I initial made the two holes for the pressure lines and then added the pass thru for the wires once I figured out where the pressure lines needed to be. Simple process and was done rather quickly. I then concentrated on the hose routing in the tray area. I cut and crimped all the connection points required aft of the baggage bulkhead wall and finalized the routing of the hoses. I will add more pictures to this posting later, not all taken at this point.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.