KitLog pro

Powered By Kitlog Pro v2.0

GAYLON'S WEB SITE
' style=
Date:  4-24-2007
Number of Hours:  3.00
Manual Reference:  SB 06-2-3
Brief Description:  Service Bulletin 06-2-3

Performed Service Bulletin 06-2-3, vertical stabilizer. Removed VS-1012 (drilled out rivets attaching the VS-1012), cleco VS-1017 doubler plate to VS-1003, matched drilled, bedured. Cleco VS-1017 to the forward side of the VS-1003. A link to SB, http://www.vansaircraft.com/pdf/sb06-2-3.pdf
' style=

SB-06-2-3

SB-06-2-3

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.