KitLog pro

Powered By Kitlog Pro v2.0

GAYLON'S WEB SITE
' style=
Date:  6-4-2008
Number of Hours:  4.00
Manual Reference:  Section 12
Brief Description:  Fiber Glass parts,etc

Progress has been super slow, lots of things happening outside of building. Parents home, F250 breaking down, etc. However I have managed to slip in some work. I started to work with a foam lock trying to message the correct shape into it to blend into the elevator fairing with 1/8" gap. I laid a strip of cloth over the joint connecting the top portion of the rudder to the top rudder fairing. I plane on doing this to all the fairings. I will sand them to a smooth transition between pieces. I finished mounting the rear strobe and marker light base mount. More pictures to come.
' style=

Top of rudder.

Top of rudder.

' style=

Foam

Foam

' style=

Flush mounting the strobe base

Flush mounting the strobe base

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.