Cut F-1091 to length, drilled VA-101 while inserted into the F-1091 push tube. Then separated, deburred, Alluma Prep, Alodine, and then painted inside. Am allowing the inside to dry for several days before riveting together. Also painted the F-1098 shims, battery box, and elevator trim assembly.