KitLog pro

Powered By Kitlog Pro v2.0

GAYLON'S WEB SITE
' style=
Date:  9-29-2013
Number of Hours:  8.00
Manual Reference:  none
Brief Description:  Installed the ELT – ACK Technologies

Sept 29th, 2013. 8 hours

Installed the ACK Technologies ELT under the vertical stabilizer where many other RV10 builders have placed it. Created 4 stand offs so the ELT could be raised to fit into the given spot. I routed the 4 pin telephone cable to the front panel and mounted the ELT antenna. I have yet to route the GPS signal wire to the ELT since that is part of the Avionics harness that is not installed yet.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.