PIcture 2 shows one of the two Bearing Assemblies riveted to the baggage rib. Note the row of three pop rivets from left to right also go through the Bearing Bracket Brace.
Picture 3 shows the completed unit with both bearing assemblies riveted to the brace.
Today's work takes me past the 500 hour mark. I'll need to prepare another batch of parts next.