KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  8-13-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Right Wheel

Got the left wheel put together, inflated and torqued and safety wired. Also installed the hydraulic line elbows in the brakes. Almost got the wheels put on, but I couldn't quite lift the plane enough times to get enough wood blocks under each side to lift it high enough to slid the gear strut in place. I'll need help for that I think. Next up, get those wheels on, then install the tail feathers. Then I'll start in on the fiberglass work. Latest update on the prop is January or February. That means March or April probably.... That's fine.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.