Brief Description: Finish prep work, right Elevator
Took everything apart and deburred, and dimpled. Decided to go with some pop rivets on the spar to the skin on the bottom, and enlarged those holes to fit the rivets. Had a heck of a time dimpling those particular holes, so made due with the pop rivet dimple tool, but the dimples aren't the best. next time, I'll dimple first, then drill to size. That's what the instructions say on the pop rivet dimpling tool. I'm all done with the prep work on the right elevator, just waiting for the rain to stop so I can go outside and prime.